AP

US nuclear waste repository begins filling new disposal area

Nov 26, 2022, 10:26 AM | Updated: Nov 27, 2022, 1:54 pm

ALBUQUERQUE, N.M. (AP) — Workers at the nation’s only underground nuclear waste repository have started using a newly mined disposal area at the underground facility in southern New Mexico.

Officials at the Waste Isolation Pilot Plant made the announcement this week, saying the first containers of waste to be entombed in the new area came from Oak Ridge National Laboratory in Tennessee — one of the many labs and government sites across the country that package up waste and ship it to WIPP.

Known as Panel 8, the new area consists of seven separate rooms for placing special boxes and barrels packed with lab coats, rubber gloves, tools and debris contaminated with plutonium and other radioactive elements.

Each room measures 33 feet (10 meters) wide, 16 feet (4.9 meters) high and runs the length of a football field minus the end zones.

Carved out of an ancient salt formation about half a mile (0.8 kilometers) deep, the subterranean landfill located outside of Carlsbad received its first shipment in 1999. The idea is that the shifting salt will eventually entomb the radioactive waste left from decades of bomb-making and nuclear weapons research.

In 2014, a fire and separate radiation release forced a nearly three-year closure of the repository and a costly overhaul of the policies and procedures that govern WIPP and the nation’s multibillion-dollar cleanup program for Cold War-era waste.

Operations had to be reduced after the repository reopened because areas of the facility were contaminated and airflow needed for mining and disposal operations was limited. Now, a multimillion-dollar project is underway to install a new ventilation system, and state regulators are considering a permit change that some critics have said could lead to expanded operations.

The state Environment Department’s Hazardous Waste Bureau issued a plan this month aimed at ensuring the public has opportunities to comment on modifications or permit renewal applications.

Sean Dunagan, president and project manager of Nuclear Waste Partnership, the contractor that manages the repository, said in a statement that operations already have become more efficient with the new panel.

Creating a panel requires mining nearly 160,000 tons of salt, and it takes about 2 1/2 years to fill it with waste. For example, Panel 7 is filled with 20,056 containers, with most of them being 55-gallon (208-litre) drums.

Copyright © The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

AP

This satellite image from Planet Labs PBC shows Iran's nuclear site in Isfahan, Iran, April 4, 2024...

Associated Press

Israel, Iran play down apparent Israeli strike. The muted responses could calm tensions — for now

Israel and Iran are both playing down an apparent Israeli airstrike near a major air base and nuclear site in central Iran.

2 hours ago

Speaker of the House Mike Johnson, R-La., talks to reporters just after lawmakers pushed a $95 bill...

Associated Press

Ukraine, Israel aid advances in rare House vote as Democrats help Republicans push it forward

The House pushed ahead Friday on a foreign aid package of $95 billion for Ukraine, Israel, Taiwan and other sources of humanitarian support.

4 hours ago

southern Arizona rancher George Alan Kelly...

Associated Press

Trial of a southern Arizona rancher charged in fatal shooting of unarmed migrant goes to the jury

Closing arguments were made against a southern Arizona rancher accused of shooting an undocumented migrant on his land to death on Thursday.

1 day ago

Donald Trump's hush money trial: 12 jurors selected...

Associated Press

Although 12 jurors were picked for Donald Trump’s hush money trial, selection of alternates is ongoing

A jury of 12 people was seated Thursday in former President Donald Trump's hush money trial. The proceedings are close to opening statements.

1 day ago

A anti-abortion supporter stands outside the House chamber, Wednesday, April 17, 2024, at the Capit...

Associated Press

Democrats clear path to bring proposed repeal of Arizona’s near-total abortion ban to a vote

Democrats in the Arizona Senate cleared a path to bring a proposed repeal of the state’s near-total ban on abortions to a vote.

2 days ago

Most Americans are sleepy new Gallup poll finds...

Associated Press

Most Americans say they don’t get enough sleep, according to new Gallup poll

A new Gallup poll found that most Americans are sleepy — or, at least, they say they are. Multiple factors play into this.

4 days ago

Sponsored Articles

...

COLLINS COMFORT MASTERS

Here are 5 things Arizona residents need to know about their HVAC system

It's warming back up in the Valley, which means it's time to think about your air conditioning system's preparedness for summer.

...

DISC Desert Institute for Spine Care

Sciatica pain is treatable but surgery may be required

Sciatica pain is one of the most common ailments a person can face, and if not taken seriously, it could become one of the most harmful.

...

Fiesta Bowl Foundation

The 51st annual Vrbo Fiesta Bowl Parade is excitingly upon us

The 51st annual Vrbo Fiesta Bowl Parade presented by Lerner & Rowe is upon us! The attraction honors Arizona and the history of the game.

US nuclear waste repository begins filling new disposal area