UNITED STATES NEWS

First big piece of ‘Electric Highway’ gets juice

Mar 16, 2012, 11:05 PM

Associated Press

CENTRAL POINT, Ore. (AP) – Following a trail blazed by Indians and pioneers in covered wagons, electric car drivers hit the road Friday to inaugurate the first major section of a West Coast “Electric Highway” dotted with stations where they can charge up in 20 minutes.

The stretch of 160 miles of Interstate 5 served by eight stations marks the next big step in developing an infrastructure that until now has been limited primarily to chargers in homes and workplaces.

The stations go from the California border north to the Oregon city of Cottage Grove and are located at gas stations, restaurants and motels just off the nation’s second-busiest interstate. One is at an inn that was once a stage coach stop.

Spaced about every 25 miles, the stations allow a Nissan Leaf with a range of about 70 miles to miss one and still make it to the next. Electric car drivers will be able to recharge in about 20 minutes on the fast-chargers. The charge is free for now.

“I would say range-anxiety with these fast chargers will be nearly a non-issue for me,” said Justin Denley, who owns a Nissan Leaf and joined the caravan.

Inspired by the stations, his family is planning a trip from Medford to Portland, a distance of about 280 miles. Last summer, he took the family on a 120-mile trip to the coast and had to include an overnight stop at an RV park to charge up.

He expects the trip to Portland to take perhaps three hours longer than in a gas car, because the only chargers available for the last 100 miles are slower, level 2 chargers.

Level 1 car chargers use 110 volts, like a regular home outlet, and it can take an entire night to charge a vehicle. Level 2 uses 240 volts, like a home dryer or range, and can charge a car in three or four hours.

But Level 3, which uses 480 volts of direct current, makes en route charging feasible by boosting a Nissan Leaf’s 45-kilowatt battery from a 20 percent charge to 80 percent in less than 30 minutes.

Bruce Sargent said, when he was using a Level 1 charger at home, he barely noticed the difference in his electric bill. When he installed a Level 2 charger, it went up about $15 a month, still far below what he was spending on gas.

“For drivers to build confidence in driving hundreds of miles like they do in gas cars, they need an infrastructure,” said Wahid Nawabi, senior vice president of AeroVironment, Inc., the Monrovia, Calif., company that makes the stations.

Interstate 5 stretches 1,350 miles from British Columbia to Baja, Calif. The section from Ashland to the Willamette Valley follows an ancient Indian trail that was expanded by pioneers who blazed a southern branch of the Oregon Trail in the 1840s.

The governors of Oregon, California and Washington signed an agreement to turn I-5 into an “Electric Highway” in 2009.

Oregon made a deal with Nissan in 2010 to start aggressively installing charging stations if the company focused sales of electric cars in the state, said Art James, project leader for the state transportation department.

The latest addition is financed by $915,000 in federal stimulus grants. “That’s why Oregon is a leader,” with about 1,100 plug-in electric vehicles in the state, James said.

By the end of this year, DC fast-chargers will be installed along I-5 from Canada to the California border, a distance of about 550 miles. Another 22 are being installed in locations as far away as 120 miles from Portland, Oregon’s largest city.

The eight new charging stations each have a level 3 charger, and a level 2 charger for backup.

Drivers equipped with an electronic key fob can drive up and plug in around the clock. They get the fob when they sign up with AeroVironment’s charging program. Stations can be located with smartphones and software on the cars.

The Interstate 5 stretch is not the first electric highway corridor in the country.

That honor goes to Tennessee, where Cracker Barrel Old Country Store restaurants installed a network of charging stations last year along interstates connecting Nashville, Knoxville and Chattanooga, a total of 425 miles.

(Copyright 2012 The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.)

United States News

Associated Press

Someone fishing with a magnet dredged up new evidence in Georgia couple’s killing, officials say

McRAE-HELENA, Ga. (AP) — Someone using a magnet to fish for metal objects in a Georgia creek pulled up a rifle as well as some lost belongings of a couple found slain in the same area more than nine years ago. The Georgia Bureau of Investigation says driver’s licenses, credit cards and other items dragged […]

9 minutes ago

Associated Press

Supreme Court to weigh whether doctors can provide emergency abortions in states with bans

WASHINGTON (AP) — Nearly two years after overturning the constitutional right to abortion, the Supreme Court will consider Wednesday how far state bans can extend to women in medical emergencies. The justices are weighing a case from Idaho, where a strict abortion ban went into effect shortly after the high court’s 2022 decision overturning Roe […]

50 minutes ago

Associated Press

Pentagon set to send $1 billion in new military aid to Ukraine once bill clears Senate and Biden

WASHINGTON (AP) — The Pentagon is poised to send $1 billion in new military aid to Ukraine, U.S. officials said Tuesday as the Senate began debate on long-awaited legislation to fund the weapons Kyiv desperately needs to stall gains being made by Russian forces in the war. The decision comes after months of frustration, as […]

2 hours ago

Associated Press

US government agrees to $138.7M settlement over FBI’s botching of Larry Nassar assault allegations

DETROIT (AP) — The U.S. Justice Department announced a $138.7 million settlement Tuesday with more than 100 people who accused the FBI of grossly mishandling allegations of sexual assault against Larry Nassar in 2015 and 2016, a critical time gap that allowed the sports doctor to continue to prey on victims before his arrest. When […]

3 hours ago

Associated Press

Remains believed to be missing woman, daughter found at West Virginia home on same day suspect died

BECKLEY, W.Va. (AP) — Remains believed to be that of a woman and her daughter who have not been seen in nearly 24 years were found at a southern West Virginia home on the same day that the girl’s alleged killer died while imprisoned, state police said. Susan Carter and her daughter, Natasha “Alex” Carter, […]

3 hours ago

Associated Press

Chicago woman convicted of killing, dismembering landlord, hiding some remains in freezer

CHICAGO (AP) — A Chicago woman has been convicted of killing and dismembering her landlord and putting some of the victim’s remains inside a freezer in the boarding house where she lived. A Cook County jury convicted Sandra Kolalou, 37, late Monday of all the charges she faced, including first-degree murder, dismembering a body, concealing […]

5 hours ago

Sponsored Articles

...

COLLINS COMFORT MASTERS

Here are 5 things Arizona residents need to know about their HVAC system

It's warming back up in the Valley, which means it's time to think about your air conditioning system's preparedness for summer.

...

Fiesta Bowl Foundation

The 51st annual Vrbo Fiesta Bowl Parade is excitingly upon us

The 51st annual Vrbo Fiesta Bowl Parade presented by Lerner & Rowe is upon us! The attraction honors Arizona and the history of the game.

...

Collins Comfort Masters

Avoid a potential emergency and get your home’s heating and furnace safety checked

With the weather getting colder throughout the Valley, the best time to make sure your heating is all up to date is now. 

First big piece of ‘Electric Highway’ gets juice